
Getting Started MAN0575-04-EN
PAGE 19 of 97
© Horner APG.This drawing is the property of Horner APG. And shall not be disclosed or reproduced except as specifically authorised.
Profibus Modules User Manual
EO 09-0009
3.7 Verifying a Project
The following describes the steps to configure a SmartStack Profibus DP Master as a class 2 Master:
Action Menu in the System Configurator
•
Create a new project
File > New > PROFIBUS
•
Choose Horner DP Master and provide bus address
Insert > Master
•
Set the bus parameter Mark the Master (left Mouse click), then
Settings > Bus Parameters
•
Set device assignment if no automatic assignment has
occurred
Mark the Master (left Mouse click), then
Settings > Device Assignment
•
Save project
File > Save
•
Download Mark the Master (left Mouse click), then
Online > Download
•
Live List Mark the Master (left Mouse click), then
Online > Live List
•
Call DP class 2 function Mark the Hilscher Master (left Mouse click), then
Online > Message Monitor
Table 3.6: Steps for Configuration as a Class 2 Master.
Note (*1): The functions for Profibus DP class 2 are activated by messages or by the application
program.
Comentarios a estos manuales